Solver Setting - Dyn
Jump to navigation
Jump to search
Navigation: User Guide ➔ Menu Commands ➔ View ➔ Solver Settings ➔ Dynamic
SS Only | Dynamic Mode Only | ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
FS_Solver | ProBal | Dynamic | Method | Scenario | Spills | Vents | SS Monitor | SS Finder | Convergence | GlobalTear | Tears | TearTags | Tolerances | Analysis | Changes |
Related Links: Solver Setting - SS Monitor, Solver Setting - SS Finder
The Dynamic tab page lists the simulation time information as well as allows the user to load in a historian tag list.
Tag (Long/Short) |
Input / Calc |
Description |
Dyn... | ||
Current Simulated Date and Time | ||
Time.Fmt | Display | Formatted version of the current simulated Simulation Time. |
Time | Display | The current simulated Simulation Time as a number. Note that zero time reference is 1/1/1970 |
Simulated Date & Time broken down into components | ||
TimeRec... | ||
mSecs | Display | Displays the current simulation time "Milliseconds" segment |
Secs | Display | Displays the current time simulation "Seconds" segment |
Mins | Display | Displays the current time simulation "Minutes" segment |
Hours | Display | Displays the current time simulation "Hours" segment |
Days | Display | Displays the number of days (using time reference of 1/1/1970) for the current simulation time |
TimeIntoDay | Display | Displays the time passed into the current day (ignoring milliseconds). Equal to Hours*3600 + Mins*60 + Secs. |
DateRec... | ||
Day | Display | Displays the current simulation date "Day" Segment. For example, if the current date is 28-05-2007, it will display 28 here. |
Month | Display | Displays the current simulation date "Month" Segment. For example, if the current date is 28-05-2007, it will display 5 here. |
Year | Display | Displays the current simulation date "Year" Segment. For example, if the current date is 28-05-2007, it will display 2007 here. |
DayOfWeek(1=Sunday) | Display | Displays the current date as in Day of the week. For example, if the current date is 28-05-2007, which is a Monday, it will display 2 here. A Calendar look-up is used to find the day of the week. |
DayOfWeekDescription | Display | Displays the current date as in Day of the week. For example, if the current date is 28-05-2007, it will display Monday here. |
DayOfYear | Display | Displays the current simulation's date as number of days in the year. |
MonthDescription | Display | Displays the current date in terms of month. For example, if the current date is 28-05-2007, it will display May here. |
DaysInMonth | Display | Displays the number of days in the current month. For example, if the current date is 28-05-2007, it will display 31 here. |
DaysInYear | Display | Displays the number of days in the current Year. For example, if the current date is 28-05-2007, 365. |
NextDateRec... (The following variables are very useful to use in the Archiver Report for Trigger tests. Also useful in PGM files to overcome the one iteration behind problem.) | ||
Day | Display | Displays the simulation date for the next iteration - "Day" Segment. For example, if the date for the next iteration is 29-05-2007, it will display 29 here. |
Month | Display | Displays the simulation date for the next iteration - "Month" Segment. For example, if the date for the next iteration is 29-05-2007, it will display 5 here. |
Year | Display | Displays the simulation date for the next iteration - "Year" Segment. For example, if the date for the next iteration is 29-05-2007, it will display 2007 here. |
DayOfWeek(1=Sunday) | Display | Displays the simulation date for the next iteration as in Day of the week. For example, if the date for the next iteration is 29-05-2007, which is a Tuesday, it will display 3 here. |
Options for Setting Date & Time at project load | ||
TimeOnLoad... | ||
Method | Project | This option allows the user to set the simulation date & time at project load. If "Project" method is selected, then the saved project time will be used. |
Historian | If the "Historian" method is selected, then the historian time will be used on project load. This could be different to the saved project time as historian time advances during project run, even if the project was not saved after project run. | |
Project.Time.Fmt | Display | Formatted version of the saved project simulated time. |
Project.Time | Display | The saved project simulated time as a number. Note that zero-time reference is 1/1/1970 |
Historian.Time.Fmt | Display | Formatted version of the project simulated time recorded by the historian. |
Historian.Time | Display | The project simulated time recorded by the historian displayed as a number. Note that zero-time reference is 1/1/1970 |
Options for Steady State Analysis | ||
SSM.On | Tickbox | This adds the SS Monitor Tab, which is used to monitor selected variables' approach to Steady State |
SSF.On | Tickbox | This adds the SS Finder Tab, which is used to find Steady State solutions based on user defined tests. |
Options for setting tag list for Historian | ||
HistorianTagList... | ||
Folder | Display | The path of the Historian Tag List |
File | Input | User can specify all the Historian Tags on a List (Text file) and load it into SysCAD here. |
Edit | Button | User can edit the Historian Tags List |
Browse | Button | User can browse for the Historian Tag List |
SetTagList | Set Now Button | Adds the tags to the SysCAD Historian. |
NOTE: The first line in the Historian Tag list is ignored, user can place heading or comments there. The tags to be loaded starts from Line 2 of the file.
Example Historian Tag List file:
Tag for Historian MULTI_STORE.Mt (t) MULTI_STORE.Summary.[0].Mt (t) MULTI_STORE.Summary.[1].Mt (t) MULTI_STORE.Summary.[2].Mt (t) P100.Qm (t/h) P101.Qm (t/h) P102.Qm (t/h)