Introduction
The EvalSeq tab page gives information on Network Evaluation Statistics.
Tag (Long/Short) | Description | |
EvalSeq... | ||
Network Evaluation Statistics | ||
When | Off | Network evaluation will not be performed. |
Once | Network evaluation will be performed once at the start of the next run. | |
Always | Network evaluation will be performed every iteration/step. | |
For each row in the table below, the following items are displayed:
| ||
Products | ||
Audit | Only shown in steady-state projects. | |
ProductsSurge | Only shown in dynamic projects. | |
Discrete | Only shown in dynamic projects. | |
TestClosure | ||
DemandReqd | Only shown in steady-state projects. | |
Pressures | Only shown in steady-state projects. | |
Derivs | Only shown in dynamic projects. | |
Product Evaluation Networks | ||
Network.Count | The number of networks in the project. | |
For each network (row in the table), the following items are displayed:
| ||
Clipboard Report | ||
This section allows a customised table of data to be copied to the clipboard. The table has one row for each unit and contains the following column headings:
| ||
Task | StartStep | |
ConfigureJoins | ||
GrpMeasure | ||
GrpTraverse | ||
GrpConverge | ||
FlowInfo | ||
PBCheckData | ||
PBFlngCheckData | ||
PBMMPreJoinPressures | ||
PBMMPreJoinProducts | ||
PBMMPostEvalProducts | ||
Products | ||
ProductsSurge | ||
ODEOperate | ||
Discrete | ||
Audit | ||
Totaliser | ||
TestClosure | ||
DemandAvail | ||
DemandReqd | ||
Pressures | ||
Derivs | ||
Integral | ||
States | ||
Statistics | ||
CheckDataRanges | ||
FlngCheckDataRanges | ||
TraceChangeInit | ||
TraceChange | ||
Order | Sequential | The table of values in the report will be sorted by SeqNo. |
StartTime | The table of values in the report will be sorted by Start Time. | |
Thread | The table of values in the report will be sorted into separate tables for each Thread. | |
Percentage | Tickbox | If enabled, the time values in the report will be shown as percentages rather than absolute times. |
Report | Button | Will copy a table/s of data to the clipboard for pasting into another application such as Excel. |